Skip to content
home
  • about us
  • our work
  • contact us
  • Our COVID-19 Response
Previous Image
Next Image

IMG_7047

The end stretch of Pine Link can be the most treacherous considering grade and general traction along mossy boulders.  

Blue bead Lily

Posted on September 19, 2017September 19, 2017

Post navigation

Published in2017 White Mountains Trail Maintenance

Recent News

  • Landscape Design Process: Our Way
  • Our COVID-19 Response
  • The Ecological Landscape: ELA 2020
  • Erosion Control: Solution-based Design
  • New England Landscape Trends
  • Designing Meadows
  • Vermont Landscapes: Advertising Design
  • Vermont Flower Show – 2019
  • VNLA Winter Meeting 2019
  • Design-First Benefactors: Client, Contractor and Designer
apld.orgela.org ser.org nature.org

  • about us
  • our work
  • contact us
client portal

Recent News

  • Landscape Design Process: Our Way
  • Our COVID-19 Response
  • The Ecological Landscape: ELA 2020

Portsmouth, New Hampshire

603.662.5453

Stowe, Vermont

802.585.7767

Portland, Maine

207.747.2992

email
On Facebook
linked in
houzz
blog

On Instagram

Zachary Berger Associates, Ltd. site by kimballrexford.com